What was found
REPLACE I/B BUSHINGS ON I/B R/H GROUND SPOILER (C CHECK RO 1/20/22) REPLACED INBOARD BUSHING ON INBOARD RH GROUND SPOILER IAW CRJ 200 AMM 20-26-00 AND REO 601R-57-51-982 REV -A DATED 2022-01-19 ANALASIS TO DETERMIN ADDITIONAL REQUIREMENTS WILL BE COMPLETED WITHIN 12 MONTHS OF THE ISSUE DATE OF THIS REPAIR (AIRCRAFT MUST NOT BE OPERATED BAYOND 12 MONTHS FROM THE ISSUE DATE OF THIS REPAIR)