What was found
COMPLY WITH: 670BA-53-036 - FUSELAGE - CENTER FUSELAGE, FS669.40 TO FS855.40 - REPLACEMENT OF THE BEAMS AF LBL36 AND RBL36, AND THE FLOOR ASSEMBLY BETWEEN FS693.00 AND FS847.00 WITH BEAMS INSTALLED AT BL0, LBL9, LBL18, LBL27, RBL9, RBL18 AND RBL27 REV D PART(S) 0 (FILED CLOSED) COMPLIED WITH SB 670BA-53-036 FUSELAGE CENTER FUSELAGE FS669.40 TO FS 855.40 REPLACMENT OF THE BEAMS AT LBL AND RBL 36AND FLOOR ASSY SEE ATTACHED SB AND CONTINUATION CARD FOR DETAILS OF WORK PERFORMED