What was found
CORROSION FOUND ON RBL9.0 FLOOR BEAM CAP BETWEEN FS1025 AND FS1035. (C-CHECK RO 3/11/2022) REMOVED AND REPLACED CORRODED FLOOR BEAM SECTION WITH NEW FABRICATED FLOOR BEAM SECTION AT RBL9.0 BETWEEN FS1025.00 AND FS1035.00 WITH ALL NEW HARDWARE PER CRJ700 SRM 53-00-41-201-001-A01 REPAIR-001-A01 FIG. 53-00-41-991-830 SHEETS 1-4. SEE CONTINUE CARD FOR FURTHER DETAILS. / SKYCARD 51-900-1002-SKY COMPLIED WITH.