What was found
*AFT CARGO FLOOR SUPPORT ANGLE BETWEEN LBL 27 €“ 36, ATTACHED TO BULKHEAD 621.00 (C-CHECK RO 3/14/2022) REMOVED CORROSION AFT CARGO FLOOR SUPPORT ANGLE BETWEEN LBL27-36 ATTACHED TO BULKHEAD FS 621.00 REF CRJ200 SRM 51-21-06 / ORIGINAL MATERIAL .094 IAW CRJ SRM 200 53-61-43 AFTER REWORK .094 MATERIAL LOSS .000 NO LIMITS AVAIABLE BLENDED AREA FOUND TO BE OUT OF LIMITS / COMPLIED WITH REO 601R-53-61-4690 REV-- DATE 2012-10-24