As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
R/H WING FLAP HINGE BOX LUG FITTINGS I/B AND O/B DAMAGED AT WS178 FLAP HINGE BOX REQUIRES REMOVAL FOR REPAIR. (C-CHECK RO 4/20/2022) COMPLIED WITH REO 601R-57-21-3579 REV - - DATED 2022-03-14 , BLENDING OF GOUGES ON ON FLAP HINGE BOXES AND LUGS. COMPLETED SKYWEST TASK CARD 51-900-1003-SKY. NO CHANGE WEIGHT AND BALANCE. SEE CONTINUATION CARD FOR ALL WORK PERFORMED.