As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
LBL9 FLOOR BEAM INBOARD SIDE IS CORRODED BETWEEN F.S. 473 TO F.S. 484. (C-CHECK RO 7/26/2022) COMPLIED WITH MHIRJ REO 601R-53-41-3037 REV-- DATED: 2022-06-29. COMPLETED SKYCARD 51-900-1003-SKY AND COMPLETED 337 ATTACHED. +.38 WEIGHT CHANGE. REFERENCE CONTINU CARD AND SKY CARD FOR WORK PERFORMED .