What was found
COMPLY WITH ETD2023-170-009941 DIPOSITION A. TEMPORARY REPAIR FOR DAMAGES #1 TO #4, (SEE FIG 1 AND FIG 5). MAJOR REPAIR. (FILED CLOSED)COMPLIED WITH TEMP REPAIR TO RT FUSELAGE BETWEEN FR 20 AND FR23 AND BETWEEN STGR 23R AND 26R PER ETD 2023-170-009941 REV B. DAMAGE A #1 TO #4 (SEE FIG 1 AND FIG 5). COMPLIED WITH STRUCTURAL MAJOR REPAIR RII 51-00-00-002-SKY-U.SEE M-337 ATTACHED. REPAIR VALIDITY IS 12 MONTHS AS OF APRIL 21, 2023 AS STATED ON ETD. NO ADDITIONAL INSPECTIONS REQUIRED DURING 12 MONTH VALIDITY OF TEMPORARY REPAIR. AFTER REPAIR ACCOMPLISHMENTS HAVE BEEN COMPLETED.