What was found
POSSIBLE CRACK AT F.S. 319 FRAME, FWD SIDE AT STGR 2R. (C-CHECK RO 10/29/2023) COMPLIED WITH PERMANENT REPAIR ON FRAME SECTOR FS319. BETWEEN STRG-1R -STGR -2R, ENSURED ALL REQUIREMENTS ARE MET IN REF REO 601R-53-21-3650 REV-- DATED 2023-09-06. COMPLIED WITH TASK CARD 51-900-1003-SKY REMOVE AND REPLACE FS605 FRAME SECTOR AT STGE 17L-19L. (C-CHECK RO 10/29/2023) REMOVED AND INSTALLED NEW FRAME SECTOR AT FS605 BETWEEN STRG17L AND 19L REF CRJ 200 SRM 51-42-06 AND DWG 601R36026 REV AE. COMPLIED WITH 51-900-1003-SKY AND PRESSURE CHECKS GOOD . SEE CONTINUATION CARD FOR DETAILS