What was found
AFT PRESSURE BULKHEAD FORWARD FACE HAS 1 GOUGE ON DOUBLER AT LBL27.50, 3 GOUGES AT LBL18.00, 2 GOUGES AT LBL9.50, 1 GOUGE AT RBL18.00, 1 GOUGE AT RBL 27.50, AND 1 GOUGE AT RBL35.20 (MARKED WITH TAPE) (FILED CLOSED) COMPLIED WITH REO 601R-53-61-8224 DATED: 2024-09-06 REV -- BLENDED AFT PRESSURE BULKHEAD (FS621.00) FORWARD FACE 1 GOUGE ON DOUBLER AT LBL27.50, 3 GOUGES AT LBL18.00, 2 GOUGES AT LBL9.50, 1 GOUGE AT RBL18.00, 1 GOUGE AT RBL 27.50, AND 1 GOUGE AT RBL35.20, AFT PRESSURE BULKHEAD FORWARD FACE SCRATCH AT THE TOP OF BULKHEAD IN BETWEEN BL0.00 AND RBL9.50 AND REPLACED DAMAGED FASTENERS ON DOUBLERS AT LBL36.20, LBL27.50 , LBL18.00, LBL9.50, RBL18.00, RBL27.50, AND TWO DAMAGED FASTENERS AT RBL36.20. COMPLETED 51-900-1003-SKY AND M-337. ALL NDTS COMPLIED WITH WITH NO DEFECTS AT THIS TIME.