Service difficulty report · Valve · Emb ERJ170200LR

Difficulty date
June 23, 2025
Submitted
July 3, 2025
Operation
Air carrier
Aircraft
N168SY
Make and model
Emb ERJ170200LR
Aircraft serial
17000617
Aircraft time
21,419 hours, 12,961 cycles
Part
Valve
Part number
10012463
Part serial
2015050020
Condition
Faulted
Location
Rt Engine
Part time
25,151 hours, 14,993 cycles
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AIRCRAFT SUFFERED LOSS OF PRESSURIZATION TWICE. BLEED 2 FAIL CAUTION IN FLIGHT OCCURRED TWICE. BOTH AT FL220. RAN QRH FOR BOTH OCCURRENCES. CAUTIONS AND ADVISORIES PRESENT USING EVENT WERE: ICE CONDITION, PACK 1 OFF, BLEED 2 FAIL. (FLIGHT 5746 - FILED CLOSED)IDENTIFIED CMC CODE 361-001-42 UPON ARRIVAL TO AIRCRAFT. DUE TO ODI EVENT, REMOVED AND REPLACED RH ENGINE HPSOV REFERENCING APPLICABLE STEPS OF AMM 36-11-01. LEAK CHECK OF RH ENGINE HPSOV GOOD AT THIS TIME. REMOVED AND REPLACED RH TORQUE MOTOR CONTROLLER REFERENCING APPLICABLE STEPS OF AMM 36-11-06. LEAK CHECK OF RH TORQUE MOTOR CONTROLLER GOOD AT THIS TIME. FUNCTIONAL TESTS OF RH HPSOV AND RH NAPRSOV GOOD AT THIS TIME. REMOVED AND REPLACED RH BLEED OVERPRESSURE HPSOV SWITCH REFERENCING APPLICABLE STEPS OF 36-14-08. FUNCTIONAL TEST OF RH BLEED OVERPRESSURE HPSOV SWITCH GOOD AT THIS TIME. PERFORMED CABIN PRESSURIZATION USING RH ENGINE AS BLEED SOURCE RUNNING ONLY RH PACK REFERENCING APPLICABLE STEPS OF AMM 21-31-00. NO LOSS OF PRESSURIZATION NOTED, ALSO NO ABNORMAL FLUCTUATIONS DURING PRESSURIZATION.

More about the Emb ERJ 170-200 LR