What was found
RIGHT ELEVATOR INBOARD HINGE OUTER PCU FITTING GOUGED AS MARKED ON LOWER SIDE NEXT TO FASTENER (C-CHECK RO 10/06/2025) REPAIRED AND COMPLIED WITHALL STEPS REO 601R-55-21-608 REV-- DATED: 2025-06-19 COMPLIED WITH REO 601R-55-21-608 REV-- DATED: 2025-06-19 STEP 1-2 ENSURED BLEND-OUT WAS PERFORMED TO A SMOOTH CONTOUR AND NDT INSPECTION PERFORMED ON ITEM #3 NO DEFECTS WAS NOTED (SEE ATTACHED REPORT FOR MORE DETAILS) COMPLIED WITH TASK CARD 51-900-1003-SKY