What was found
FOUND SURFACE CORROSION ON THE LH FORWARD PRESSURE BULKHEAD FITTING UPPER SURFACE FLANGE FS 686.00 - FS 698.00 & LBL 9.00 (C-CHECK RO 02/22/2026)COMPLIED WITH REO 670-53-41-777 REV-- DATED 2025-11-28. AND BLENDED SURFACE CORROSION ON THE LH FORWARD PRESSURE BULKHEAD FITTING UPPER SURFACE FLANGE FS 686.00 - FS 698.00 & LBL 9.00. REFERENCE CP 31271411 FOR EDDY CURRENT. PERFORMED UT REMAINING THICKNESS INSPECTION WITH REFERENCE TO PART 4, NDTM 51-00-000-270 AND FOUND TO BE WITHIN LIMITS. COMPLETED CORROSION FINDINGS REPORT. COMPLIED WITH TASK CARD 51-900-1002-SKY. COMPLETED FORM M-337.