As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
LH OB FLAP HINGE ARM WS178.00 INBD LEADING EDGE-SIDED BUSHING REQUIRES FABRICATION (C-CHECK RO 08/28/2026)PERFORMED A MAJOR REPAIR BY FABRICATING FREEZE PLUG AND DRILLING TO SIZE, AND INSTALLING SERVICEABLE BUSHING INTO HINGE ARM WITH BOMBARDIER REO 601R-57-53-001 REVC 1/20/2020 AND MHIRJ REO 601R-57-54-405 REV --