SDR SWIA972604

Service difficulty report · Clamp · Emb EMB120ER

Difficulty date
May 26, 2001
Submitted
June 1, 2001
Operation
Air carrier
Aircraft
N294SW
Make and model
Emb EMB120ER
Aircraft serial
120321
Aircraft time
12,191 hours, 17,314 cycles
Engine
Pwa PW118B
Part
Clamp
Condition
Loose
Location
Bleed Air
Stage of operation
CL
How discovered
O
Nature of condition
J, G
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

JUST AFTER TAKEOFF FROM PDX, RECEIVED A DUCT LEAK WARNING ON MAP AND UPPER PANEL RIGHT PACK. CONSULTED QRH AND RETURNED FOR LANDING AT PDX. LIGHT WENT OUT ON DESCENT INTO PDX ABOUT 2,000 FT. DURING QRH PROCEDURE WHEN BLEED WAS CLOSED BLUE HYDRAULIC INDICATOR WENT TO EMPTY WITH NO ASSOCIATED WARNING. INVESTIGATED, FOUND BAD WIRE ON THERMAL SWITCH. REPAIRED SAME. FOUND TWO LEAKING CLAMPS AT HEAT EXCHANGER. REPAIRED AND TIGHTENED CLAMPS AND FOUND A DEICE SYSTEM PRESSURE REGULATOR LEAKING. REMOVED AND REPLACED PRESSURE REGULATOR. RAN ENGINES, NO LEAKS. OPS CHECK GOOD AS PER MM 30-10-20. P/N: 38E96-6A, S/N ON: B2407.

More about the Emb EMB-120ER