What was found
DURING D-CHECK, THE VERTICAL STABILZIER TENSION TIES REQUIRED REWORK ACCORDING TO BOEING SB 55-0071. THE REWORK DIMENSIONS SET FORTH EXCEEDED THE SB LIMITS. REWORK DIMENSIONS WERE APPROVED BY BOEING. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING D-CHECK, THE VERTICAL STABILZIER TENSION TIES REQUIRED REWORK ACCORDING TO BOEING SB 55-0071. THE REWORK DIMENSIONS SET FORTH EXCEEDED THE SB LIMITS. REWORK DIMENSIONS WERE APPROVED BY BOEING. (X)