What was found
TRANSVERSE BEAM CRACKED JUST O/B OF RBL 9 AT FS 280. CLEANED AREA NEED NDT TO CONFIRM CRACK. PERFORMED ET INSPECTION OF THE FLOOR SUPPORT BEAM BETWEEN AT FS280.00 RBL9 AND 27 IAW CRJ 200 NDT MANUAL PART 1 CHAPTER 51-20-06. BEAM CRACKED AT LOWER RADIUS JUST OTBD OF RBL 9 AT VERTICAL SUPPORT BEAM ATTACHMENT. CRACKED SECTION OF TRANSVERSE BEAM WAS CUT OUT AND REPLACED DURING REPAIR ON F/S 280 WORK ACCOMPLISHED ON N/R-280 W/O 25868 PSP19749 (CLOSED)