What was found
POSSIBLE CRACK ON THE LT 640 FRAME BETWEEN 9 AND 12 STR. PERFORMED EDDY CURRENT INSPECTION OF REPAIR DOUBLER AT F.S. 640.00 FRAME, LEFT SIDE, BETWEEN STR. 9 AND STR. 12 I/A/W CRJ 200 NDTM 51-20-06. REPAIR DOUBLER IS CRACKED. REMOVED 640 DOUBLER. STARTED REMOVING RIVETS IN 640 FRAME THROUGH THE SKIN IAW S.B.601R-53-061. REMOVED FASTNER IN FRAME TO GAIN ACCESS,AND CUT FLANGE IAW PLK601R36009. LOCATED EXISTING HOLES IN -37 REINFORCEMENT FLANGE AND -39 DOUBLER IAW S.B. 601R-53-061. LOCATED AND DRILLED ADDED FASTENER HOLES IN -37 REINFORCING FLANGE, ALL WORK PER SB 601R-53-061 AJ 21906. PERFORMED EDDY CURRENT INSPECTION OF CUT LINE AFTER STEP 3 FLANGE CUT PER SB 601R-53-061 IAW CRJ 2OO NDTM PART 1. 51-20-06.