What was found
SUSPECTED CRACK AT RIGHT SIDE BASE OF VERTICAL STAB AT FS 1181. WORK COMPLETED IN ACCORDANCE WITH: PERFORMED EDDY CURRENT INSPECTION OF RIGHT SIDE BASE OF VERTICAL STAB AT FS 1181 IAW CRJ700 NDTM 51-20-006. AREA IS CONFIRMED CRACKED AND MARKED. 03/19/08 VTJ7010159. REMOVED DAMAGE PER REO 670-55-31-018. PERFORMED EDDY CURRENT INSPECTION OF CUT LINE ON RIGHT DRAG ANGLE IAW REO 670-55-31-018 PER CRJ 700 NDTM 51-20-006. NO DEFECTS NOTED. 03/20/08 VTJ7010159. STARTED FABRICATING 670-55-31-018-3 DOUBLER AND -4 FILLER FROM 2024T3 .090" PO# TO3606 RT SIDE V/STAB TO FUSELAGE ATTACH ANGLE PER REO 670-55-31-018. FINISHED FABRICATING DOUBLER -3 AND FILLER -4 PER REO 670-55-31-018. INSTALLED FILLER AND DOUBLER IAW REO670-55-31-018 DB 7020877. APPLIED TOPCOAT FINISH TO REPAIR AREA LOCATED ON RT BASE OF VERTICAL STAB AT FS 1181 PER CRJ 700 SRM 51-21-16. JOB COMPLETE. SUPPLEMENTAL SDR CLOSED 3/31/08.