What was found
SUSPECTED CRACK AT LEFT SIDE BASE OF VERTICAL STAB AT FS 1181. WORK COMPLETED IN ACCORDANCE WITH: PERFORMED EDDY CURRENT INSPECTION OF LEFT SIDE OF BASE OF VERTICAL STAB AT FS 1181 PER CRJ700 NDTM 51-20-006. AREA IS CONFIRMED CRACKED AND MARKED. 03/19/08 VTJ7010159. REMOVED OLD ANGLE AND DRILLED UP NEW ANGLE P/N AV670-21186-003 PER CRJ 700 SRM 51-42-13, 51-42-21, AND 51-42-22. BAT 7023167. INSTALLED DRAG ANGLE LOCATED ON LT SIDE OF VERTICAL STAB AT FS 1181 PER DWG NO PLBA 670-35002. APPLIED FAYING SEAL AND AO23 FINISH PER CRJ 700 SRM 51-23-00 AND 51-25-01. SM17032 JOB COMPLETE. SUPPLEMENTAL SDR CLOSED 3/31/08.