What was found
FS 280 FLOOR SUPPORT STRUCTURE IS CRACKED O/B OF LBL 9 AT MLG MANUAL RELEASE PULLEY BRACKET. CUT AWAY CRACKED SECTION OF FLOOR ANGLE IAW REO 601R-53-11-138. COMPLIED WITH REO 601R-53-11-138. PERFORMED LPI OF FS 280 ANGLE LBL 9 REPAIR IAW NDTM 51-20-08. NO INDICATIONS NOTED AT THIS TIME. INSTALLED REPAIR ANGLE AT FS 280 LBL 9 IAW REO 601R-53-11-138. APPLIED PAINT TO REPAIR IAW SRM 51-25-01. FABRICATED REPAIR ANGLE THAT WAS INSTALLED ON STEP 3 USING 7075-0 .050 PO 83061/1. HEAT TREATED PART TO 7075-T62 AS REQUIRED IAW REO 601R-53-11-138 STEPS 3-5 AND AMS2771 FOR HEAT TREAT.