What was found
SEAT RAIL AT RBL 9 FS 290 TO 559 HAS AREAS OF CORROSION. BLENDED CORROSION TO REMOVAL IAW SRM 51-21-06. DEPTH OF BLEND RANGED FROM 0.001" TO 0.008". 390 AND 406+128 AREAS STILL NEED CORROSION REMOVED. REMOVED CORROSION FROM FS 390 TO 406+128. DEPTH RANGED FROM .007 TO .008 WHICH IS WITHIN REPAIRABLE LIMITS IAW SRM 53-21-49. DAMAGE WAS REMOVED IAW 51-21-06 AND UPON INVESTIGATION FOUND TO BE WITHIN REPAIRBALE LIMITS OF SRM 53-21-49. 4. NEEDS ALODINE. APPLIED ALODINE IAW CRJ 200 SRM 53-21-49. (A)