As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
JOB 8801621 OPERATION 159 RH INBD AND OTBD 280 CLIPS ARE CRACKED AT RBL 9. THIS SDR WILL REMAIN OPEN PENDING MX DETERMINATION OF AN APPROPRIATE CORRECTIVE ACTION. REMOVED CRACKED ANGLES (INBD AND OTBD). INSTALLED NEW ANGLES PN 601R3113-58 IAW CRJ 200, SRM 51-42-06/ -21. SUP CLOSED 9/11/2008 (K)