DURING APPROACH AT EIS WHEN SELECT THE FLAPS TO 30 DEG. NEVER WENT DOWN, THE FLAPS WITH WENT AROUND, CAME BACK TO SJU AND THE FLAPS NEVER WENT DOWN TO FLAPS 15 OR 30 DEGREES, WITH MAKE A LANDING WITH FLAPS 0 DEG, FLAP 0 DEG LANDING PROCEDURES. R & R BOTH FLAP VALVE BLOCK FLOW RESTRICTORS IAW JIC 27-54-71, ALSO PERFORMED VISUAL INSP TO FLAP CONTROL SYS, FLAP ACTUATORS, HYD LINES CHECKED FOR RUBBING AND FOUND OK. PERFORMED OPS CHECK OF FLAP CONTROL SYS IAW JIC 27-51-00 AND FOUND WORKING PROPERLY AND LEAK CHECK GOOD.