What was found
DURING ENGINE GROUND RUN-UP NOTICED HEAVY WHITE SMOKE ON START-UP AND AFTER SHUTDOWN OF RT ENGINE. R & R NL SENSOR SEALING TUBE PACKINGS IAW MM 72-00-02. ENGINE GROUND RUN -UP NO SMOKE NOTICED AT THIS TIME.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING ENGINE GROUND RUN-UP NOTICED HEAVY WHITE SMOKE ON START-UP AND AFTER SHUTDOWN OF RT ENGINE. R & R NL SENSOR SEALING TUBE PACKINGS IAW MM 72-00-02. ENGINE GROUND RUN -UP NO SMOKE NOTICED AT THIS TIME.