What was found
DURING SCHEDULED HEAVY CHECK INSP, CORROSION WAS FOUND ON THE FWD PRESSURE IN 3 AREAS OF THE BULKHEAD WEB. COMPLIED WITH AE EO E2-53MR-258 FRAME 1 FWD PRESSURE BULKHEAD WEB CORROSION BLEND OUT REPAIR, NDT REQUIREMENTS ACCOMPLISHED NO DEFECTS NOTED AT THIS TIME, REF AMS -NDT REPORT 8130-3 NR100708-19, SRI DO/TS-3819/10-13824, SRAS DO/TS-3819/10, 5898, OPENED A TDMI TO PERFORM DVI OF BLEND OUT AERA'S EVERY 2 YEARS.