As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
FABRICATED NEW PRESSURE WEB REPAIR DOUBLER. ALODINED AND PRIMED ALL BARE ALUMINUM. FAY SURFACE SEAL INSTALLED REPAIR DOUBLER WITH BMS 5-95 AND FASTENERS IDENTIFIED. APPLIED CORROSION INHIBITING COMPOUND TO THE INTERNAL SURFACES. REPAIR COMPLETED IAW ECO 3328, PART 1 AND V. AIRCRAFT RETURNED TO SERVICE. (M)