What was found
DURING CHECK-C MAINT, FOUND CORROSION ON FWD OTBD END OF TRACK, RBL 22 AROUND BLANK HOLE. REMOVED CORROSION 0.020, WHICH WAS WITHIN SRM 53-05 LIMITS, FROM BLANK HOLE AT END OF TRACK PER SPM 6-80-1 AND TREATED OUTER FLANGE HOLE PER SRM 51-10-3, PARA 3D. FINISHED PER SRM 51-10-3, PARA 23.