What was found
DURING CHECK-C MAINT THE RT WING O/B FLAP, 5 FEET I/B OF O/B CANOE AND 6 INCHES FWD OF TE FLAP, AREA 3 IN BY 3 IN DELAMINATED. APPLIED CONDUCTIVE COATING AND PRIMED PER SRM 51-24-02. PAINTED PER SRM 51-24-00. APPLIED 7 IN BY 5 IN PATCH PER SRM 51-70-05. REMOVED DAMAGE, CLEANED AND INSTALLED 5.5 IN BY 4.5 IN, HOT BOND REPAIR PER SRM 51-70-05.