What was found
DURING CHECK-C MAINT, FOUND CORROSION ON SUB FLOOR MEMBRANE AT STA 160 TO 200, LBL 6 IN TO RBL 53 INCHES. REPLACED SUB FLOOR MEMBRANE STA 160 TO 200, LBL 12 TO RBL 59, WITH 0.020 7075-T6, INSTALLED WITH SEALER AND 3 ROWS OF ATTACHMENT FASTENERS PER SRM 53-01, PAGE 18 FIG 4 SHEET 3.