What was found
DURING CHECK-C MAINT, MEMBRANE BELOW FLOOR STA 1140 TO 1180, LBL 48 TO 56, HAD CORROSION ON UPPER AND LOWER SURFACES. REMOVED CORROSION PER SRM 53-01, PAGE 18 FIG 4 SHEET 3, AND TWA STD PROCEDURES MANUAL 6-80-01 PAGE 1 TO 3. TREATED AND PRIMED PER SRM 51-10-3 PAGE 46. REPLACED DOUBLERS PER SRM 53-01, PAGE 18.