What was found
IN THE PROCESS OF CLOSING THE L-1 DOOR THE ESCAPE SLIDE DEPLOYED. INSTALLED SEVICEABLE SLIDE PER MD9-25-03. AC-03 01-11-00 JFK.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
IN THE PROCESS OF CLOSING THE L-1 DOOR THE ESCAPE SLIDE DEPLOYED. INSTALLED SEVICEABLE SLIDE PER MD9-25-03. AC-03 01-11-00 JFK.