What was found
DURING OP 16 MAINT CHECK, CABIN FLOOR SUPPORT AT LBL 46 TO LBL 56 HAD HEAVY CORROSION. REPLACED FLOOR SUPPORT AT STA 200 FROM LBL 46 TO 56 WITH RIVETS PER SRM 51-36-02. PATTERN FROM OLD PART. ALODINED, PRIMED, AND PAINTED WHITE. ---CLOSED---