What was found
DURING OP 16 MAINT CHECK, FOUND IN CABIN CORROSION ON FLOORBEAM AT STA 200, LBL 32 IN TO 43 IN. INSTALLED FLOORBEAM, FABRICATED FROM EXTRUSION, PER SRM 53-11-1, FIG 11. INSTALLED RIVETS PER SRM 51-30-2. PARTS TREATED PER SRM 51-10-3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OP 16 MAINT CHECK, FOUND IN CABIN CORROSION ON FLOORBEAM AT STA 200, LBL 32 IN TO 43 IN. INSTALLED FLOORBEAM, FABRICATED FROM EXTRUSION, PER SRM 53-11-1, FIG 11. INSTALLED RIVETS PER SRM 51-30-2. PARTS TREATED PER SRM 51-10-3.