What was found
DURING CHECK-C MAINT, AT STA 1322, RBL 17 TO RBL 51, LEVEL 2 CORROSION ON TOP OF FLOOR BEAM. REPAIRED AS INSTRUCTED ON ARA 16962. REMOVED CORROSION PER SPM 6-80-01. CORROSION TREATMENT PER ARA. TREATED PER SRM 51-10-3, PARAGRAPH 47.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING CHECK-C MAINT, AT STA 1322, RBL 17 TO RBL 51, LEVEL 2 CORROSION ON TOP OF FLOOR BEAM. REPAIRED AS INSTRUCTED ON ARA 16962. REMOVED CORROSION PER SPM 6-80-01. CORROSION TREATMENT PER ARA. TREATED PER SRM 51-10-3, PARAGRAPH 47.