What was found
DURING OP 15 MAINT CHECK FOUND PRESSURE DECK BULKHEAD DOUBLER WAS CRACKED AT 718 CASTING, LT MLG WHEEL WELL. REPLACED DOUBLER AND SEALED PER SRM 51-20-0 AND 51-60-0. FASTENER SUBSTITUTION PER SRM 51-30-5 FASTENER INSTALLATION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OP 15 MAINT CHECK FOUND PRESSURE DECK BULKHEAD DOUBLER WAS CRACKED AT 718 CASTING, LT MLG WHEEL WELL. REPLACED DOUBLER AND SEALED PER SRM 51-20-0 AND 51-60-0. FASTENER SUBSTITUTION PER SRM 51-30-5 FASTENER INSTALLATION.