What was found
DURING CHECK-C MAINT FLOORBEAM UPPER FLANGE AT STA 1338 HAD CORROSION, RBL 22 TO O/B END. INSTALLED NEW UPPER FLANGE. TREATED AND PAINTED SAME. INSTALLED ALL FASTENERS AND ATTACHING PART PER SRM 51-30-0 AND DAC DRAWING 9915561.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING CHECK-C MAINT FLOORBEAM UPPER FLANGE AT STA 1338 HAD CORROSION, RBL 22 TO O/B END. INSTALLED NEW UPPER FLANGE. TREATED AND PAINTED SAME. INSTALLED ALL FASTENERS AND ATTACHING PART PER SRM 51-30-0 AND DAC DRAWING 9915561.