What was found
DURING OP 15 MAINT CHECK, THE MEMBRANE AT STA 897 TO 965, RT SIDE, HAD CORROSION BEYOND LIMITS AND CRACKED. REMOVED AND REPLACED MEMBRANE AT STA 897 TO 965 WITH NEW MEMBRANE FABRICATED IN SHOP AND SENT TO PAINT SHOP FOR PAINT. INSTALLED PER SRM 51-30-2. HI-LOKS PER SRM 51-30-5.