What was found
DURING OP 15 MAINT CHECK, THE FLOOR SUPPORT WAS CORRODED AT RBL 0 TO 58 STA 200, AND AT BL 0 AT STA 160 TO 237. REMOVED OLD SUPPORTS. MADE NEW SUPPORTS PER SPM 6-70-01 AND SRM 53-10-1. INSTALLED PER SRM 51-30 PAGE 18.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OP 15 MAINT CHECK, THE FLOOR SUPPORT WAS CORRODED AT RBL 0 TO 58 STA 200, AND AT BL 0 AT STA 160 TO 237. REMOVED OLD SUPPORTS. MADE NEW SUPPORTS PER SPM 6-70-01 AND SRM 53-10-1. INSTALLED PER SRM 51-30 PAGE 18.