What was found
DURING OP 15 MAINT CHECK IN THE COCKPIT, CORROSION WAS FOUND IN FASTENER HOLES UNDER FLOOR PANEL NUMBER 3. REMOVED CORRODED TRACK SECTION. INSTALLED NEW SEAT TRACK PER SPM 6-70-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OP 15 MAINT CHECK IN THE COCKPIT, CORROSION WAS FOUND IN FASTENER HOLES UNDER FLOOR PANEL NUMBER 3. REMOVED CORRODED TRACK SECTION. INSTALLED NEW SEAT TRACK PER SPM 6-70-01.