What was found
DURING CHECK-C MAINT, FOUND CORROSION ON FLOOR SUPPORT STA 180, RBL 10 TO RBL 44. NEW FLOOR SUPPORT FABRICATED PER DRAWING 9936534. PAINTED PER SRM 51-10. INSTALLED FASTENERS PER SRM 51-30-2, SRM 51-30-05. SEALED STIFFENER PER SRM 51-20-0.