What was found
DURING CHECK-C MAINT AT STA 845, LBL 58, CASTING WAS CRACKED BELOW FLOOR AT FUSELAGE FORMER TO FLOORBEAM TIE, LT. INSTALLED NEW CASTING PER DOUGLAS DRAWING 3920341 AND SPM 6-70-01. INSTALLED HI-LOKS PER SRM 51-60-0 PAGE 36 FIG 4 PIN SUBSTITUTION TABLE AND PER SRM 51-3-0 PAGE 12 HI-LOK INSTALLATION. TORQUED HI-LOKS PER SRM 51-30-1 PAGE 11 TO 13.