What was found
DURING CHECK-C MAINT IN THE AFT CARGO COMPT FLOOR SUPPORT WAS CORRODED AT STA 1155, LONGERON 29R TO 28L. INSTALLED NEW FLOOR SUPPORT PER SRM 51-30-5.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING CHECK-C MAINT IN THE AFT CARGO COMPT FLOOR SUPPORT WAS CORRODED AT STA 1155, LONGERON 29R TO 28L. INSTALLED NEW FLOOR SUPPORT PER SRM 51-30-5.