What was found
DURING CHECK-C MAINT, FOUND MEMBRANE WITH 3 INCH CRACK AT LBL 50, STA 1022, BETWEEN NUMBER 1 AND 2 FLOOR TRACKS. REPAIRED CRACK AT LBL 50 INCHES, STA 1022 MEMBRANE PER SRM 53-01, FIG 2, SHEET 3 AND PAGE 9. TREATED AND PRIMED AREA PER SRM 51-10-2.