What was found
DURING CHECK-C MAINT RT SIDE OF CABIN FLOOR, MEMBRANE WAS CRACKED OUT NEXT TO SIDE WALL AT STA 1297, JUST FWD OF LAV WALL. INSTALLED DOUBLER PER SRM 53-01 FIG 2, SHEET 3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING CHECK-C MAINT RT SIDE OF CABIN FLOOR, MEMBRANE WAS CRACKED OUT NEXT TO SIDE WALL AT STA 1297, JUST FWD OF LAV WALL. INSTALLED DOUBLER PER SRM 53-01 FIG 2, SHEET 3.