What was found
DURING CHECK-C MAINT IN FWD CARGO COMPT FOUND CORROSION AT LONGERON 29R, STA 352 TO 360. INSTALLED NEW LONGERON PER SPM 6-70-01. INSTALLED SPLICE PER SRM 53-02, FIG 18. INSTALLED FASTENERS PER SRM 51-30-03. PRIMED AND PAINTED PER SRM 51-10-3.