What was found
DURING CHECK-C MAINT IN THE AFT CARGO COMPT, THE FLOOR SUPPORT WAS BROKEN AND CORRODED BETWEEN STA 1155 AND 1147, BETWEEN LONGERON 29R AND 30R. REMOVED OLD PART AND INSTALLED NEW PER SPM 6-70-01. FASTENER INSTALLATION PER SRM 51-30-5.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING CHECK-C MAINT IN THE AFT CARGO COMPT, THE FLOOR SUPPORT WAS BROKEN AND CORRODED BETWEEN STA 1155 AND 1147, BETWEEN LONGERON 29R AND 30R. REMOVED OLD PART AND INSTALLED NEW PER SPM 6-70-01. FASTENER INSTALLATION PER SRM 51-30-5.