What was found
DURING CHECK-C MAINT FOUND CORROSION ON LONGERON 20L, STATION 218 TO 224. REMOVED AND REPLACED LONGERON FROM STA 200 TO 224, FACTORY SPLICE TO FWD END, PER SPM 6-70-01, AND SRM 51-30-1. USED SRM 51-30-5 FOR FASTENER INSTALLATION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING CHECK-C MAINT FOUND CORROSION ON LONGERON 20L, STATION 218 TO 224. REMOVED AND REPLACED LONGERON FROM STA 200 TO 224, FACTORY SPLICE TO FWD END, PER SPM 6-70-01, AND SRM 51-30-1. USED SRM 51-30-5 FOR FASTENER INSTALLATION.