What was found
MCI - DURING OP-16, FOUND CORROSION ON ANTENNA MOUNT DOUBLER FORWARD SIDE BETWEEN LONGERON 20L AND LONGERON 29L, FS 2678. REMOVED AND REPLACED DOUBLER PER SRM 51-01 AND TWA STANDARD PRACTICES. AIRCRAFT TOTAL TIME: 26,489 HOURS; 13,301 CYCLES. (X)