What was found
MCI - DURING OP-16, FOUND CORROSION ON FORMER FOOT, BETWEEN LONGERON 29R AND 30R, FS 1993. REMOVED CORROSION PER SRM 51-10-03, PARAGRAPH 31-48. REPLACED FASTENERS PER SRM 51-30-0. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MCI - DURING OP-16, FOUND CORROSION ON FORMER FOOT, BETWEEN LONGERON 29R AND 30R, FS 1993. REMOVED CORROSION PER SRM 51-10-03, PARAGRAPH 31-48. REPLACED FASTENERS PER SRM 51-30-0. (M)