What was found
MCI - DURING OP-16, FOUND CORROSION ON TOP OF FLOOR TRACK, LBL 56, STATION 1211. REMOVED CORROSION PER SRM 51-10-3, REPAIRED GALLEY TIE DOWN HOLE PER ARA 10750. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MCI - DURING OP-16, FOUND CORROSION ON TOP OF FLOOR TRACK, LBL 56, STATION 1211. REMOVED CORROSION PER SRM 51-10-3, REPAIRED GALLEY TIE DOWN HOLE PER ARA 10750. (M)